Flatbed & Specialized Shipping Guide

What to prepare for flatbed, pipe, oversized and heavy freight, before anyone commits to a truck.

Start with the freight

Open-deck equipment depends on the cargo’s size and weight, and on how it loads. Share those first, and we can review suitable options with carrier partners.

If your freight isOptions to discuss
Loaded from the side, top or rearFlatbed
Too tall for a standard flatbedStep deck or double drop
Long pipe, beams or sectionsExtendable
Machinery that drives onRGN / lowboy
Very heavyMulti-axle configurations

See the equipment page for diagrams of each option.

Measure the cargo

  • Give length, width and height with units, and say whether they include packaging.
  • Give the weight of each piece and the total.
  • Note the heaviest point and any overhang.
  • Share drawings or photos if you have them.

Give us cargo dimensions, not loaded truck dimensions. The loaded size depends on the equipment, and we work that out with you.

Securement and tarping

TiedownTiedown Supports keep pipe off the deck
Pipe rests on supports and is tied down to the deck. Actual methods are set for each load.

Federal cargo securement rules cover how cargo is contained, immobilized and tied down, and some commodities have specific requirements. Accurate cargo details help carrier partners plan securement for your load.

Tell usWhy it helps
Pieces, weight and shapeSets the number and type of tiedowns
Surfaces that can be damagedEdge protection or padding may be needed
Weather sensitivityTarps may be needed
Pickup and delivery equipmentStraps and tarps must suit how it’s unloaded

Shipping pipe

  • Give the material, diameter, length, joint count and total weight.
  • Say whether pipe is coated, bundled or loose.
  • Say how it will be stacked and whether supports or chocks are provided.
  • Confirm the lifting equipment at both ends, including job sites.

Oversized and overweight loads

Permits come from state agencies, not the federal government, and local roads can have their own rules. Requirements depend on the load, route and jurisdictions.

  • Permits are coordinated for the specific move and route.
  • Route reviews may be needed for height, width or weight.
  • Pilot cars or escorts may be required for some loads.
  • Travel can be limited by time, weather or location.

We don’t publish universal size or weight limits because they vary by equipment, route and jurisdiction. FR8 Logistics Solutions does not issue permits or guarantee approval.

Loading and site access

At each siteWhat to confirm
Loading methodCrane, forklift or drive-on
Who loadsShipper, receiver or a rigging contractor
Truck accessRoad width, ground conditions and turning room
TimingAppointments and site hours

Tell us about the shipment

You don’t need every detail to get started. Share what you have, and we’ll follow up on the rest.